DB Regional business unit
Transport contracts in Germany
Transport contracts awarded (rail) | Term | Volume | ||
p. a. 1) | total 1) | |||
Netz Elbe Spree (NES) lots 2 und 3 | 12/2022 – 12/2034 | 14.5 | 171.3 | |
S-Bahn (metro) Stuttgart | 07/2028 – 06/2032 | 13.5 | 54.0 | |
E-Network East SH | 12/2022 – 12/2035 | 4.2 | 54.6 | |
Nuremberg S-Bahn (metro) S6 | 12/2021 – 12/2030 | 0.6 | 5.4 | |
Suburban traffic Munich - Buchloe | 12/2021 – 12/2026 | 0.7 | 3.3 | |
Line extension FTX Jena - Leipzig | 12/2018 – 12/2032 | 0.5 | 2.7 | |
Transition contract RE1 Göttingen - national border | 12/2018 – 12/2021 | 0.1 | 0.4 | |
Total 1) | 34.1 | 291.6 |
1) Differences due to rounding are possible.
In the German regional rail passenger transport market, 12 tender procedures were concluded by the contracting organization in the first half of 2019 (first half of 2018: nine). In total, about 59 million train-kilometers (train km) were awarded (first half of 2018: 35 million train km). Of the train km awarded in the first half of 2019, some 54% were previously provided by DB Group companies. DB Regional won seven awards (including published contract amendments) (first half of 2018: six) and 58% (first half of 2018: 88%) of the awarded train km.
Transport contracts awarded (bus) H1 2019 | Term | Volume | ||
p. a. 1) | total 1) | |||
Schleswig - Flensburg South | 01/2020 – 12/2029 | 2.5 | 24.9 | |
North Frisia South | 08/2019 – 07/2029 | 2.0 | 20.2 | |
North Frisia North | 08/2019 – 07/2029 | 1.6 | 16.4 | |
OD Stormarn Lot 1 | 12/2019 – 12/2029 | 1.5 | 14.7 | |
WTV - Waldshut West | 12/2019 – 12/2029 | 1.4 | 14.0 | |
Kleve II | 12/2019 – 11/2029 | 0.8 | 8.1 | |
MVV 231, 236 | 12/2019 – 12/2027 | 0.9 | 7.1 | |
KVV - Hardt-West/North | 12/2019 – 12/2027 | 0.7 | 5.7 | |
Other (8 contracts) | 8 – 10 years | 14.6 | 142.6 | |
Total1) | 26.0 | 253.7 |
1) Differences due to rounding are possible.
In bus services, a volume of 70 million commercial vehicle kilometers (bus km) were awarded in Germany in the first half of 2019 (first half of 2018: 66 million bus km) in 83 tenders (first half of 2018: 102 tenders). Of the bus km, 36% (first half of 2018: 48%) were previously operated by DB Regional Bus.
In the first half of 2019, we participated in 44 tenders (first half of 2018: 68 tenders) with a volume of 48 million bus km (first half of 2018: 49 million bus km). We won 31% of the tender procedures in which we participated (first half of 2018: 75%).