Transport contracts in Germany

Transport contracts awarded (rail)
first half of 2018

Term

Volume
(million train km)

p.a. 

total 1)

S-Bahn (metro) Berlin
transitional contract Subnet
north-south and city line

12/2017 – 06/2027

25.9

205.0

2022 Taunus line

12/2021 – 12/2036

1.5

22.5

Ulm diesel network

12/2020 – 12/2032 2)

1.6

19.2

RB line 83 Wittlich – Trier –
Luxembourg – Dommeldange

12/2019 – 12/2024

0.5

2.4

Dresden – Pirna S-Bahn (metro) line

04/2018 – 12/2027

0.1

1.0

Taunus line

12/2020 – 12/2021

1.0

1.0

Total 1)

30.6

251.1

1) Differences due to rounding are possible.
2) Option for extension.

In the local rail passenger transport market in Germany, nine tender procedures were concluded in the first half of 2018 (in the first half of 2017: 12) and about 35 million train kilometers (train km) (in the first half of 2017: 33 million train km) were awarded. Of the train kilometers awarded, about 86% had previously been operated by companies within DB Group.

DB Regional won six tender procedures (including published contract amendments) (in the first half of 2017: eight procedures) and 88% (in the first half of 2017: 85%) of the train kilometers awarded.

Transport contracts awarded (bus)
first half of 2018

Term

Volume
(million bus km) 1)

p.a.

total 1)

Osnabrück Süd

02/2019 – 01/2029

3.9

38.7

VRN – Mosbach

01/2019 – 12/2028

2.6

25.9

VRN – Buchen

01/2019 – 12/2028

2.1

21.4

VVS – Ludwigsburg 06 – Marbach

08/2019 – 06/2029

1.8

14.9

Alzey – Worms Nord

08/2019 – 06/2029

1.5

14.5

VGF – Freudenstadt ewA 2018

12/2018 – 12/2026

1.9

13.3

KVV – Lußhardt

12/2018 – 12/2026

1.7

13.3

Holzminden district

08/2018 – 07/2020

2.3

4.7

Other (32 contracts)

1 – 10 years

15.9

124.4

Total 1)

33.7

272.9

1) Differences due to rounding are possible.

In bus services, a volume of 66 million bus kilometers (bus km) was awarded in Germany in the first half of 2018 (in the first half of 2017: 27 million bus km) in 102 tenders (in the first half of 2017: 60 tenders). Of the bus kilometers awarded, 48% (in the first half of 2017: 38%) were previously operated by DB Regional Bus.

In the first half of 2018, we participated in 68 tenders (first half of 2017: 43 tenders) with a volume of 49 million bus km (first half of 2017: 21 million bus km). We won 75% of the tender procedures in which we participated (first half of 2017: 19%).